Ropeways

Agudio ropeways, the evolution of the species

Agudio material ropeways represent the cutting edge of technology in the industry. These are fully automated systems that do not require personnel for loading and unloading operations and guarantee the highest level of performance.

Agudio is able to design new cableways or revamp existing ones to increase their level of automation and achieve the highest standards of safety, reliability, and efficiency.

Features of the Agudio Cableways

Capacity
up to
800
Ton/h
Vehicle capacity up to
2,5
Speed
up to
7
m/s
Slope
over the
100
%
Spans
beyond the
1500
m
Single and double rope systems

Single and double rope systems

Depending on the capacity and routing, Agudio is able to design material ropeways with a single track-hauling rope or bi-cable ropeways where a track rope supports the buckets and a hauling rope controls their movement, thus being able to design spans longer than 1500 meters.

Material loading

Material loading

Loading of the material inside the buckets can vary depending on material caracteristics and ropeway capacity. For low-capacity ropeways, a fixed loading system can be used, while for higher-capacity ropeways, a rotating feeder is commonly used.

Material offloading

Material offloading

The shape of the bucket and the unloading of the material depend on the characteristics of the material itself. The material can be unloaded through the bottom of the bucket or by tipping the entire bucket; after unloading, a bucket cleaning system can be provided, as well as a storage and washing system.

Synchronization

Synchronization

The main feature of Agudio ropeways is the high level of automation, a mix of hardware and software that allows the system's capacity to be varied simply by adjusting the speed of the haul rope, with automatic synchronization of all operations within the stations.

Featured project

Predaia ropeway, Italy

Predaia ropeway, Italy

A new cableway to transport apple bins in both directions between the collection center and the access tunnel to the underground storage rooms, the natural cold storage rooms where the apples are stored after harvest. In addition to the cableway, an automatic fork for loading and unloading the bins has been installed, as well as roller conveyors and a 30 m high elevator to reach the upper level of the underground storage rooms.

Go to the project

Other projects

Luzenac ropeway, France

Luzenac ropeway, France

Material ropeway to transport 200 ton/h of talc from the quarry to the production plant. Purpose of the project was the complete replacement of the existing cableway with new stations, supports, cables, buckets, control system, loading and unloading systems, and a bucket cleaning system.

Discover more
Apiai ropeway, Brazil

Apiai ropeway, Brazil

Overhaul and upgrade of the material ropeway connecting the quarry with the production plant in order to increase its capacity from 325 to 450 ton/h. The main interventions were: replacement of the buckets, anchoring of the track ropes and installation of a new control system for synchronising the movement of the buckets in the three stations.

Discover more
Boteni ropeway, Romania

Boteni ropeway, Romania

Replacement of the ropeway operating at the Campulung site for transporting raw materials from the quarry to the cement plant. The project involved the complete replacement of the electromechanical components (while maintaining the existing stations) and the addition of a new control system to synchronize bucket movements within the stations.

Discover more
Savona ropeway, Italy

Savona ropeway, Italy

Various overhauls of the historic cableway connecting the port of Savona to the Cairo Montenotte industrial area, including the replacement of 1,300 vehicle grips, design and construction of new loading stations, merging of the San Rocco–San Lorenzo and San Lorenzo–Ciatti sections, redesign of the San Rocco diversion station, and line synchronization.

Discover more
Merone ropeway, Italy

Merone ropeway, Italy

Several revamping works have been carried out on the two ropeways connecting the Alpetto limestone quarry to the Merone cement plant, including: capacity increase with replacement of the winch and electrical equipment, replacement of buckets and tire beams in the stations, and extension of the loading station with the installation of a new rotating feeder.

Discover more
Rio Branco ropeway, Brazil

Rio Branco ropeway, Brazil

Design and construction of a ropeway to transport limestone from the Itaretama quarry to the cement plant, with an hourly capacity of 600 tons. The system has a total length of 13.7 km and consists of three cableway sections, a loading station, an unloading station, and two intermediate stations.

Discover more

Request commercial contact