Overhaul and upgrade of the material ropeway connecting the quarry with the production plant in order to increase its capacity from 325 to 450 ton/h. The main interventions were: replacement of the buckets, anchoring of the track ropes and installation of a new control system for synchronising the movement of the buckets in the three stations.