Rope-hauled systems for material transport

Ideal solutions for all sectors

Flyingbelt, cableways, and ropeways are the ideal solution for moving bulk materials or single loads over difficult terrain, easily and sustainably crossing mountains, valleys, rivers, etc.

Industria del cemento

Cement

Settore minerario

Mining

Settore edile

Construction

Settore idroelettrico

Hydroelectric

Logistica

Logistics

Settore Portuale

Port

Agudio in figures

90+
Systems installed
20+
Countries where we are present
650+
Km of ropes installed
160+
Years of history

Design and build

setting new standards

Innovation and sustainability

expressed at the highest levels

Latest news

Flyingbelt Taldih, India

Flyingbelt Taldih, India

Just over a year ago, Adani Enterprises Limited and Rourkela Steel Plant (RSP) signed an agreement for the development and operation of the Taldih iron ore mine, located in the Koida block in the state of Odisha, India.

Discover more
Agudio at SME and PDAC

Agudio at SME and PDAC

In recent months, Agudio has taken part in leading mining trade fairs and conferences across North America.

Discover more
Flyingbelt Barroso: 10 years in operation

Flyingbelt Barroso: 10 years in operation

In 2025, the Barroso Flyingbelt reached the significant milestone of 10 years of operation.

Discover more
New contract for a 6-ropes flyingbelt

New contract for a 6-ropes flyingbelt

The signing of this new contract has kicked off the design activities for a new Flyingbelt that will be installed in 2027 in an iron mine in India.

Discover more
Apples in the sky

Apples in the sky

Yesterday, the commissioning of the Melinda apples monocable ropeway was successfully completed.

Discover more
From the Alps to underground cold rooms: the new Melinda cableway for zero-impact apples.

From the Alps to underground cold rooms: the new Melinda cableway for zero-impact apples.

Testing of the new ropeway for transporting apples for the Melinda consortium in the province of Trento is ongoing.

Discover more
CVA looks to the future: works begins on the new multi-purpose funicualr for Valpelline hydropower plant

CVA looks to the future: works begins on the new multi-purpose funicualr for Valpelline hydropower plant

Construction of the new multi-purpose funicular on the Valpelline power plant in the Aosta Valley began in June.

Discover more
New life for villa's multi-purpose funicular: revamping of the installation

New life for villa's multi-purpose funicular: revamping of the installation

The Villa hydroelectric power plant is located in the Orco Valley, 50 km north of Turin. It has been in operaion since 1962 and generates approximately 80 GWh of renewable energy per year.

Discover more
Over 5,000 hours: the Agudio cablecrane serving the Koysha dam construction site

Over 5,000 hours: the Agudio cablecrane serving the Koysha dam construction site

The cablecrane has been in operation since 2021 and is playing a strategic role in optimizing construction operations for the Koysha hydroelectric power plant in southwestern Ethiopia. The cablecrane has now exceeded 5,000 hours of operation and will remain in operation until the dam is completed, which is scheduled for 2029.

Discover more

Featured project

Predaia ropeway, Italy

Predaia ropeway, Italy

A new cableway to transport apple bins in both directions between the collection center and the access tunnel to the underground storage rooms, the natural cold storage rooms where the apples are stored after harvest. In addition to the cableway, an automatic fork for loading and unloading the bins has been installed, as well as roller conveyors and a 30 m high elevator to reach the upper level of the underground storage rooms.

Go to the project

Contact us

Please rotate your device to portrait mode.