Ropeway Icona Ropeway
1978

Rio Branco ropeway, Brazil

Design and construction of a ropeway to transport limestone from the Itaretama quarry to the cement plant, with an hourly capacity of 600 tons. The system has a total length of 13.7 km and consists of three cableway sections, a loading station, an unloading station, and two intermediate stations.

Project features

Icona Length Length
13700
m
Icona Height difference Height difference
400
m
Icona Capacity Capacity
600
ton/h
Icona Speed Speed
5
m/s
Icona Vehicles Vehicles
475

Request commercial contact

Please rotate your device to portrait mode.