Various overhauls of the historic cableway connecting the port of Savona to the Cairo Montenotte industrial area, including the replacement of 1,300 vehicle grips, design and construction of new loading stations, merging of the San Rocco–San Lorenzo and San Lorenzo–Ciatti sections, redesign of the San Rocco diversion station, and line synchronization.