Boteni ropeway, Romania

Replacement of the ropeway operating at the Campulung site for transporting raw materials from the quarry to the cement plant. The project involved the complete replacement of the electromechanical components (while maintaining the existing stations) and the addition of a new control system to synchronize bucket movements within the stations.

Project features

Icona Length Length
650
m
Icona Height difference Height difference
80
m
Icona Capacity Capacity
120
ton/h
Icona Speed Speed
2,5
m/s
Icona Vehicles Vehicles
31