Several revamping works have been carried out on the two ropeways connecting the Alpetto limestone quarry to the Merone cement plant, including: capacity increase with replacement of the winch and electrical equipment, replacement of buckets and tire beams in the stations, and extension of the loading station with the installation of a new rotating feeder.