Koysha cablecrane, Ethiopia

Revamping of the radial cable crane previously used for the construction of Gibe III dam, increasing the capacity to 35 tons, the travel speed to 6 m/s, and the lifting speed to 2.5 m/s. Other features of this cable crane include a fixed point with a 45 m tower and a 235 m radial runway.

Project features

Icona Payload Payload
35
ton
Icona Span Span
1230
m
Icona Translation Translation
6
m/s
Icona Hoisting Hoisting
2,5
m/s
Icona Hook lowering Hook lowering
300
m

Related news

Over 5,000 hours: the Agudio cablecrane serving the Koysha dam construction site

Over 5,000 hours: the Agudio cablecrane serving the Koysha dam construction site

The cablecrane has been in operation since 2021 and is playing a strategic role in optimizing construction operations for the Koysha hydroelectric power plant in southwestern Ethiopia. The cablecrane has now exceeded 5,000 hours of operation and will remain in operation until the dam is completed, which is scheduled for 2029.

Discover more
Koysha: more high-capacity cycles

Koysha: more high-capacity cycles

Works on the Koysha cablecranes in Ethiopia, aimed at increasing the number of high-capacity operating cycles, has been successfully completed.

Discover more

Request commercial contact

Privacy *
reCAPTCHA *

Please rotate your device to portrait mode.