The Flyingbelt is used to transport aggregates from the new quarry to the existing processing and storage facility, flying over the Hérault river, in compliance with local regulations requiring minimal environmental impact. One of the main advantages of this Flyingbelt is the ability to directly connect the two sites with a conveyor just 215 meters long, rather than a 10 km road journey with trucks.