Flyingbelt in operation at one of the Terzo Valico dei Giovi construction sites, it is used to transport the excavated material from the tunnel to the storage area, crossing a 300 meters valley without the need for metal supporting structures. The Flyingbelt technology was chosen by the customer for its simplicity and low environmental impact.