Cablecrane Icona Cablecrane
2018

Daivoes cablecranes, Portugal

Overhaul, installation and commissioning of two radial cablecranes to be used in the construction of the 77 metres high and 264 metres long Daivoes dam, one of the four dams planned as part of the Tamega hydroelectric project in northern Portugal.

Project features

Icona Payload Payload
2x28
ton
Icona Span Span
385
m
Icona Translation Translation
7
m/s
Icona Hoisting Hoisting
2,5
m/s
Icona Hook lowering Hook lowering
160
m

Request commercial contact