The signing of this new contract has kicked off the design activities for a new Flyingbelt that will be installed in 2027 in an iron mine in India.
This Flyingbelt will transport 2,000 ton/h of iron ore over 3 km of rough terrain, receiving the material from an overland conveyor belt and discharging it onto the next one. The Flyingbelt will be supported by only 5 towers and, to achieve a span of over 1,100 metres, it will be the first Flyingbelt with 6 track ropes.